Design of waste water treatement plant - 5FM94019

  • Number of hours

    • Lectures 0
    • Projects 0
    • Tutorials 0
    • Internship 0
    • Laboratory works 0
    • Written tests 0

    ECTS

    ECTS 20.0

Goal(s)

Learning outcomes :
Make a process diagram describing the WWTP studied.
Sizing the unit operations of a wastewater treatment plant according to specifications.
Compare the results obtained with the dimensions of the actual station.
Make a critical analysis of the existing situation by proposing relevant areas for improvement.

Responsible(s)

-

Content(s)

The apprentice should visit his company's wastewater treatment plant (or another wastewater treatment plant). Using the sizing methods seen in progress and the particular plant specification, he will have to perform the sizing calculations for the unit operations.
It will also have to make a critical analysis of the choices of the unit operations in place and compare its results with those of the existing basins.
The activated sludge treatment will be used as the reference treatment in the secondary treatment and compiled to the results for the process actually installed on site.



Prerequisites

Courses on biological treatments, settling and filtration

Test

Report on the design of the wastewater treatment plant



Note de rapport : N

Calendar

The course exists in the following branches:

see the course schedule for 2018-2019

Additional Information

Curriculum->Pagora Engineer - Apprentice->Semester 9


Sécurité-Environnement