Pagora rubrique Formation 2022

Technical Project ont the controle of the waste water treatment plant - 5FM94025

  • Number of hours

    • Lectures 0
    • Projects 2.0
    • Tutorials 0
    • Internship 0
    • Laboratory works 0
    • Written tests 0

    ECTS

    ECTS 30.0

Goal(s)

Analysis of the control system of the waste water treatment plant of the industrial site

Contact Agnes BOYER

Responsible(s)

Agnes BOYER

Content(s)

Visit of the WWTP with identification of the different sensors and actuators.
Identification of the modes of supervision, of the control loops.
Which alarm for which action ? thresholds ? action modes ? ...

Identification of the lack of equipment or programs and enhancement propositions for supervion. An economical study can be done if the factory orders it.



Prerequisites

none

Test

1 Technical report



Note rapport

Calendar

The course exists in the following branches:

see the course schedule for 2018-2019

Additional Information

Curriculum->Pagora Engineer - Apprentice->Semester 9
Curriculum->Elective Semester PIME->Semester 9


Sécurité-Environnement