Number of hours
- Lectures 0
- Projects 2.0
- Tutorials 0
- Internship 0
- Laboratory works 0
- Written tests 0
ECTS
ECTS 30.0
Goal(s)
Analysis of the control system of the waste water treatment plant of the industrial site
Contact Agnes BOYER Responsible(s)
Agnes BOYER
Content(s)
Visit of the WWTP with identification of the different sensors and actuators.
Identification of the modes of supervision, of the control loops.
Which alarm for which action ? thresholds ? action modes ? ...
Identification of the lack of equipment or programs and enhancement propositions for supervion. An economical study can be done if the factory orders it.
Prerequisites
none
Test
1 Technical report
Note rapport
Calendar
The course exists in the following branches:
- Curriculum - Pagora Engineer - Apprentice - Semester 9
Additional Information
Sécurité-Environnement
Curriculum->Pagora Engineer - Apprentice->Semester 9
Curriculum->Elective Semester PIME->Semester 9
Sécurité-Environnement