Number of hours
- Lectures 0
- Projects 18.0
- Tutorials 0
- Internship 0
- Laboratory works 0
ECTS
ECTS 20.0
Goal(s)
The students will be in charge of designin a new waste water treatment plant : they will choose the best units to treat the water taking into account the quality of the treated water.
Learning outcomes :
design an biological waste water treatment
design an physico-chemical waste water treatment
choose the unit operation adapt to the waste water and other constraints
Skils :
- inovation,
- team management
Content(s)
The student must propose a treatment line to purify wastewater in accordance with a set of specifications.
On the basis of bibliographical information, it will have to select the most relevant unit operations.
Using the sizing methods seen in progress and the particular specification of the model plant, he will have to carry out the sizing calculations for the unit operations.
It will also have to make a critical analysis of the choices of the unit operations in place and compare its results with those of the existing basins.
The activated sludge treatment will be used as the reference treatment in the secondary treatment and compared to the results for the processes obtained for the chosen process.
Translated with www.DeepL.com/Translator (free version)
Prerequisites
WWTP design report : N1
individual oral presentation : N2
Skill evaluation
N = (N1+N2)/2