Aller au menu Aller au contenu
A new generation of engineers

Paper, print media and biomaterials

A new generation of engineers
A new generation of engineers

> Education

Technical Project ont the controle of the waste water treatment plant - 5FM94025

A+Augmenter la taille du texteA-Réduire la taille du texteImprimer le documentEnvoyer cette page par mail Partagez cet article Facebook Twitter Linked In Google+ Viadeo
  • Number of hours

    • Lectures : 0
    • Tutorials : 0
    • Laboratory works : 0
    • Projects : 2.0
    • Internship : 0
    • Written tests : 0
    ECTS : 30.0
  • Officials : Agnes BOYER

Goals

Analysis of the control system of the waste water treatment plant of the industrial site

Contact Agnes BOYER

Content

Visit of the WWTP with identification of the different sensors and actuators.
Identification of the modes of supervision, of the control loops.
Which alarm for which action ? thresholds ? action modes ? ...

Identification of the lack of equipment or programs and enhancement propositions for supervion. An economical study can be done if the factory orders it.



Prerequisites

none

Tests

1 Technical report



Note rapport

Calendar

The course exists in the following branches:

  • Curriculum - Pagora Engineer - Apprentice - Semester 9
see the course schedule for 2018-2019

Additional Information

Curriculum->Pagora Engineer - Apprentice->Semester 9
Curriculum->Elective Semester PIME->Semester 9


Sécurité-Environnement

A+Augmenter la taille du texteA-Réduire la taille du texteImprimer le documentEnvoyer cette page par mail Partagez cet article Facebook Twitter Linked In Google+ Viadeo

Date of update April 18, 2019

Grenoble INP Institut d'ingénierie Univ. Grenoble Alpes